qualification study to be perform during Installation qualification but not
limited to
·
Training sheet (For keep the training attendance )
·
Purchase order verification (To match with PO)
·
Document verification (To verify Installation manual, operation manual, test certificate etc)
·
Prestart review (For clearance of start IQ)
·
Major component verification
·
Material of construction verification (MOC 316L/304 etc.)
·
Critical instruments calibration verification
·
Utility connection verification
·
Deviation and corrective action
·
List of recommended Spare parts and Lubricants
·
Identification of standard operating procedure